01 September 2024

Are you excited about the new MRT3 Circle Line?

After MRT1 and MRT2 lines, it's time to complete the final puzzle with the final line called MRT3 or Circle Line.


Members of the public can inspect the alignment map from 2 September - 2 December, 2024 at 35 locations in the Klang Valley, comprising:
  • 8 MRT Info Kiosks
  • 27 MRT Info Trucks at key sites
So, let's get a glimpse of the proposed MRT3 line here 👇👇👇:

The Circle Line MRT3 is an orbital rail line, designed to connect the existing Klang Valley public transport network and improve mobility and ease of travel for the city’s growing population.



Spanning
51 kilometers around the city’s perimeter, the Circle Line MRT3 is designed to integrate with existing MRT, LRT, KTM, and Monorail lines through 10 strategically located interchange and connecting stations.

The Circle Line MRT3 will offer shorter alternative routes to key destinations through multiple integration points along the alignment while providing critical connectivity to underserved areas of the city.

Design Principles

The MRT3 Circle Line Project is designed holistically based on the 8 principles which are grouped into 4 themes which will define the blueprint of the project.



Source: MRT Corp

🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄🚄

Follow our active FB page via

Follow our Crowdfunding FB page via

Follow our e-wallet FB page via

No comments:

Post a Comment

Finance Malaysia Blog appreciates your comment. Cheers!